Home / Search / Bandra

Bandra

The Mumbai-Ahmedabad high-speed rail project achieved its second tunnel breakthrough in a month in Maharashtra`s Palghar district on Tuesday, officials said. Pics/X

Updated 3 hours ago

The tunnel, known as MT-6, is 454 metres long and 14.4 metres wide, and is designed to accommodate both up and down tracks of the bullet train corridor. Pics/X

A thick blanket of haze enveloped Mumbai on Monday as the city’s Air Quality Index (AQI) rose to 142, placing it in the ‘moderate’ category. PICS/ Shadab Khan and Ashish Raje

Updated 1 day ago

The tunnel, known as MT-6, is 454 metres long and 14.4 metres wide, and is designed to accommodate both up and down tracks of the bullet train corridor. Pics/X
Advertisement