Home / Mumbai / Mumbai News / Article / Thane-Borivli twin tunnel project gains pace as first TBM ‘Nayak’ set for launch

Thane-Borivli twin tunnel project gains pace as first TBM ‘Nayak’ set for launch

The first tunnel boring machine, Nayak, is locked and loaded under city, with drilling to begin on Monday on the 11.8-km Thane-Borivli twin tunnel that promises to slash travel time and break one of Mumbai’s worst choke points. Rajendra B Aklekar and Ranjeet Jadhav report

Listen to this article :
Tunnel boring machine ‘Nayak’ at the project site in Manpada, Thane. Pics/Ashish Raje

Tunnel boring machine ‘Nayak’ at the project site in Manpada, Thane. Pics/Ashish Raje

The Thane-Borivli twin tunnel project is set to gain momentum with the launch of its first Tunnel Boring Machine (TBM) ‘Nayak’ on Monday. The 11.84-km underground corridor is being implemented by Mumbai Metropolitan Region Development Authority (MMRDA)and executed by Megha Engineering & Infrastructures Ltd. mid-day got an exclusive look at the preparations on site.

Team behind TBMs ‘Arjuna’ and ‘Nayak’,  which are being launched in phases at Manpada, Thane, on FridayTeam behind TBMs ‘Arjuna’ and ‘Nayak’,  which are being launched in phases at Manpada, Thane, on Friday

Read Next Story
Nimbu prices double in three weeks, pinch pockets across Mumbai

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All

Advertisement