Updated On: 31 December, 2024 02:41 PM IST | Mumbai | Rajendra B. Aklekar
The lorry was stranded after its steering wheel was jammed and could not turn straight; the driver tried to go straight across the crossing, but his vehicle kept turning left

Pic/Rajendra B. Aklekar
Suburban services on all six lines were delayed on Tuesday afternoon after a lorry carrying construction sand got stranded at the level crossing gate near Diva station.
The lorry was stranded after its steering wheel was jammed and could not turn straight. The driver tried to go straight across the crossing, but his vehicle kept turning left. This led to the reversal and detention of the vehicle, keeping the level crossing gate open.