Home / Mumbai / Mumbai News / Article /
Bullet Train project: Second tunnel breakthrough achieved in Palghar
Updated On: 03 February, 2026 05:40 PM IST | Mumbai | mid-day online correspondent
The tunnel, known as MT-6, is 454 metres long and 14.4 metres wide, and is designed to accommodate both up and down tracks of the bullet train corridor
Listen to this article :

The development marks the second tunnel breakthrough in Palghar within a month. Pic/videograb/X
The Mumbai-Ahmedabad high-speed rail project achieved its second tunnel breakthrough in a month in Maharashtra's Palghar district on Tuesday, officials said, reported the PTI.
Union Railway Minister Ashwini Vaishnaw witnessed the breakthrough virtually from New Delhi via a video link. The breakthrough took place near Saphale village.

